Skip to content
Legacy Automation Systems TwinCAT 3 Upgrade

Avoid Hidden Pitfalls in Your TwinCAT 3 Upgrade

TL;DR: Upgrading TwinCAT 3

Moving from TwinCAT 2 to 3 isn’t a routine update — it changes how your system handles libraries, code, and runtimes.

Watch for: library mismatches, stricter syntax rules, controller compatibility, visualization rebuilds, and the need for thorough testing.

A well-planned migration keeps your Beckhoff system stable, modern, and ready for what’s next.

Why TwinCAT 3 Migration Isn’t Just a Version Change

Upgrading control software always seems straightforward—especially when moving from one version to the next. On paper, TwinCAT 2 and TwinCAT 3 share the same foundation, so it’s easy to expect a smooth transition. In reality, that change introduces modifications that impact libraries, runtimes, and code structure in ways most projects don’t discover until mid-migration.

TwinCAT 2 has long been a reliable workhorse: familiar, well-documented, and dependable. However, as hardware, libraries, and standards evolve, sticking with an older platform begins to limit flexibility. Moving to TwinCAT 3 isn’t about chasing new features—it’s about ensuring your control system remains compatible with modern tools and workflows.

This guide highlights five common migration pitfalls and the practical steps to avoid them—helping your TwinCAT 3 upgrade run cleaner, faster, and with fewer surprises.

Pitfall #1 – Library and Dependency Compatibility

TwinCAT 3 manages libraries differently from TwinCAT 2. Instead of path-based references, it uses unique IDs and version control. This change improves stability but can make older projects incompatible when imported. Libraries that rely on outdated data types or renamed function blocks often require manual mapping (Beckhoff InfoSys: Differences Compared with TwinCAT 2).

How to avoid it:

      • List every .tclib used in TwinCAT 2 and include them in a dedicated migration folder.
      • Add that path in TwinCAT 3’s converter dialog (File → Open TwinCAT 2 Project).
      • Pin library versions after import and review the migration log for missing or replaced references.
      • Replace deprecated libraries manually and validate affected logic.

If your project uses custom or vendor-specific libraries, install them in TwinCAT 3 before importing—they can’t be linked afterward (Beckhoff InfoSys: Migration from TwinCAT 2).

Pitfall #2 – Code and Syntax Differences

TwinCAT 3 enforces stricter IEC 61131-3 rules than TwinCAT 2, which means some code that compiled correctly before may now generate warnings—or halt entirely. Pragmas, array initializations, and direct I/O addressing are common issues (Beckhoff InfoSys: Differences Compared with TwinCAT 2).

The best approach is to catch those mismatches early:

      • Compile the imported project immediately after conversion to surface errors, before making any other changes.
      • Replace direct I/O addressing with mapped I/O to align with TwinCAT 3 conventions.
      • Adjust array declarations to meet TC3’s dimension and initialization rules.
      • Review compiler pragmas against TwinCAT 3’s supported syntax list—some older ones are no longer valid.

These adjustments are usually simple, but skipping them can cause subtle logic issues that are hard to spot later. Consider syntax cleanup as part of the migration, not an afterthought, to ensure your first runtime test goes more smoothly.

 Pitfall #3 – Runtime and Target Compatibility

Not all Beckhoff controllers can run TwinCAT 3. Older CX models, especially those shipped with TwinCAT 2 runtimes, may not support the newer environment. Attempting to deploy mixed runtimes—TwinCAT 2 on one device and TwinCAT 3 on another—often results in failed ADS routes, license mismatches, or projects that simply won’t load (Beckhoff CX Controller Documentation).

Before starting migration, check runtime compatibility first:

      • Verify controller specs on Beckhoff InfoSys to confirm TwinCAT 3 support and available firmware.
      • Match build versions between engineering PC and target device where possible.
      • Segment migrations by hardware generation instead of upgrading everything at once.
      • Use separate engineering VMs if you still need to maintain older TC 2 runtimes alongside TC 3 projects.

Planning early around hardware limits avoids rework later—and prevents discovering mid-upgrade that your controller isn’t compatible with TwinCAT 3.

 Pitfall #4 – Visualization Migration

Visualizations are often the most visible part of a TwinCAT project and the first source of migration problems. TwinCAT 2 and TwinCAT 3 handle visualization elements differently, so importing old screens rarely works perfectly. Tag bindings, scaling, and resource links might break or behave unpredictably (Beckhoff InfoSys: Visualization Overview).

To minimize rework:

      • Export tag lists first from TwinCAT 2 to make re-binding easier in TwinCAT 3.
      • Rebuild key screens manually in the TwinCAT 3 Visualization Editor rather than relying on auto-import.
      • Check scaling and resolution settings—TwinCAT 3 handles DPI differently, especially across newer displays.
      • Test language resources and alarms early; small tag mismatches can hide until runtime.

If visualization is closely connected with operations, treat it as a small project within the migration plan. Rebuilding a few key screens early is faster than fixing broken bindings later.

Pitfall #5 – Testing and Validation

Even if a TwinCAT 2 project imports and compiles without errors, it doesn’t mean it’s ready to operate. Converted logic, I/O mappings, or retained variables might behave differently under TwinCAT 3’s runtime scheduling. Many migration issues only emerge after deployment—usually when the system is supposed to go live.

Avoid that surprise by baking testing into the migration itself:

      • Create a structured test plan before conversion—cover I/O mapping, task timing, and retained variable behavior.
      • Use simulation first to verify critical logic before deploying to hardware.
      • Validate startup and shutdown sequences on the target device; retention and task order can shift.
      • Document deltas between TwinCAT 2 and 3 configurations so issues are traceable later.

The migration tool gets you most of the way there—but thorough validation is what makes the upgrade production-ready.

Quick Pre-Flight Checklist

Before you migrate, confirm these five essentials:

Library Inventory – Record every TwinCAT 2 .tclib file and its version; store copies in a dedicated migration folder.

Compatibility Check – Verify your controller model and firmware support TwinCAT 3 runtime (especially older CX units).

Code Review – Compile immediately after import, fix syntax errors, and replace deprecated pragmas or direct I/O references.

Visualization Plan – Export tag lists and rebuild critical screens manually in TwinCAT 3 to avoid broken bindings.

Testing & Validation – Simulate logic, confirm I/O mappings, and test startup/retention behavior before commissioning.

Planning Your TwinCAT 3 Migration with Confidence

Moving from TwinCAT 2 to 3 isn’t just a version update — it’s a small but crucial modernization step that pays off when executed properly. By anticipating library compatibility, syntax modifications, runtime constraints, visualization enhancements, and conducting thorough testing, you can ensure a smooth, stable, and predictable transition.

At Pigler Automation, we have guided customers through every step of the process — from assessing system readiness to executing partial conversions and validating upgrades before deployment. Whether it’s updating legacy Beckhoff controllers, integrating EtherCAT I/O, or modernizing visualization platforms, our team is familiar with the subtle differences that make each migration unique.

A successful TwinCAT 3 upgrade doesn’t occur by chance — it happens intentionally. That’s why having an experienced engineering partner makes all the difference.

Ready to Make the Move to TwinCAT 3?

Our engineers help you bridge the gap—assessing, converting, and validating your system every step of the way.

Connect with an Engineer

Ready to Make the Move to TwinCAT 3?

 Our engineers help you bridge the gap—assessing, converting, and validating your system every step of the way.

Contact Form
Please enable JavaScript in your browser to complete this form.
Your Name
Facebook
X
LinkedIn
Email
Print

Talk Directly With an Automation Engineer

Whether it’s a PROFIBUS to PROFINET migration, a PCS 7 upgrade, or ongoing support, our engineers can help you plan your next step with clarity and confidence.

Fill out the form below, and one of our experts will be in touch to discuss how we can optimize your automation system for efficiency, reliability, and performance.

🚀 Let’s get started—your automation solution is just a conversation away!

Please enable JavaScript in your browser to complete this form.
Your Name

You’ll work directly with engineers who have designed and supported Siemens, Ignition, Beckhoff, and Rockwell systems in the field. Expect practical recommendations you can act on right away.

You're Invited to Pigler Automation's Open House & 20-Year Anniversary!